Day Eleven

Day Eleven

They didn’t get very far with the cabinet install. Apparently when the Lowe’s cabinet guy came out and measured our kitchen he was a foot off, so everything on the stove wall is 12″ from the door. And if Donna and my quick measurement of the opposite wall is correct he missed that side by 15″. So now the contractor, who was supposed to sign off the measurements with the cabinet guy, can’t figure out how things need to go to fit the room.

We are all somewhat at fault here to some degree because Donna and I didn’t check to see if the measurements were right either. The contractor is coming over at 12:30 tomorrow to talk and we may make a run over to the North Augusta Lowe’s in the morning and see if the cabinet guy is working to see what our options are now.